Re: Issue in transfer of data from ECC to APO

$
0
0

Hi,

you may want to go to the transaction /SAPAPO/SNP_SFT_PROF

 

Determine Forecast of Replenishment Lead Time

 

 

 

Use

 

In this field, you specify how the extended safety stock planning determines
the forecast of the replenishment
lead time
(RLT). The following values are available:

 

 

  • Supply Chain

 

      The system determines the RLT forecast using the supply chain structure by

 

      adding the corresponding production, transportation, goods receipt, and goods

 

      issue times. If there are alternative procurement options, the system always

 

      takes the

longest

    option into account.

 

 

  • Master Data

 

      The system determines the RLT forecast from the location product master

 

    data.

 

 

  • Master Data/ Supply Chain

 

      First, the system determines the RLT forecast from the location product

 

      master data. If no RLT forecast can be determined, the system determines the

 

      forecast using the supply chain structure (as described under

Supply
Chain

    ).

 

Dependencies

 

You can retrieve the replenishment lead time forecast yourself by using the
GET_LEADTIME
method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.

 

 

 

Replenishment Lead Time in Calendar Days

 

Number of calendar days needed to obtain the product, including its
components, through in-house
production
or external
procurement
.

 

Use

 

The replenishment lead time (RLT) is used in the enhanced methods of safety
stock planning in Supply Network Planning (SNP). The goal of safety
stock planning is to comply with the specified service level, in order
to be prepared for unforeseen demand that may arise during the replenishment
lead time. The longer the RLT, the higher the planned safety stock level.

 

Dependencies

 

The field is taken into account by the system only if you have specified
master data or master data/supply chain in the RLT: Determine
Forecast
field of the safety stock planning profile used.

 

Hope this helps.

 

The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.

 

May be if you maintain the setting in the profile, you may get the value in RELDT.

 

Thanks.